A Site Waste Management Plan (SWMP) or Construction Waste Management Plan summarises how building materials and associated waste will be managed during a project. 

The aim is to reduce the volume of waste produced on construction sites; implementing a SWMP will ensure materials are managed effectively during the construction process.

Frequently a planning requirement, we can provide SWMPs for a range of projects, including the following:

·     Quantification of construction waste arisings

·     On-site waste segregation methods

·     Anticipated processing and disposal routes

·     Industry best practice

shutterstock_1351634570.jpg