A Site Waste Management Plan (SWMP) or Construction Waste Management Plan summarises how building materials and associated waste will be managed during a project.
The aim is to reduce the volume of waste produced on construction sites; implementing a SWMP will ensure materials are managed effectively during the construction process.
Frequently a planning requirement, we can provide SWMPs for a range of projects, including the following:
· Quantification of construction waste arisings
· On-site waste segregation methods
· Anticipated processing and disposal routes
· Industry best practice